Environmental Consulting Archive
Environmental Consulting Archive
JOST-LuxCo Phase 1 Environmental Site Assessments Phase I / Phase II Environmental Site Assessments at 13 sites located in China, France, Germany, Hungary, Italy, The Netherlands, Portugal, Spain, South Africa, and United States. Document review, interviews, visual inspections of the site and surroundings; preparation of comprehensive expert reports. |
|
Environmental Performance Assessment System (EPAS) Audits On US Army installations throughout Europe, combined Environmental Management System (EMS) and Compliance Audits for drinking and wastewater, solid waste, hazardous materials and waste, refueling facilities. Compliance with German and American Standards. |
|
Environmental Management System (EMS) Implementation on US Army installations in Bavaria and Heidelberg Support of EMS-Implementation, internal audits, training, solutions for e.g., document control, hazardous substance inventories, environmental databases. |
|
Environmental Management and Emergency Response Plans On several US Army installations in Bavaria site investigations and development of management plans and emergency response plans for hazardous waste, spill prevention and response, drinking water, stormwater, observing both American and German legal and other requirements. |
|
Storage and Handling of Hazardous Materials and Waste, US Army Installations Bavaria Inventory, inspection and database inclusion of several hundred hazardous substance storage locations, classification based on hazardous substances and water endangering substances regulations, recommendations for management and repair. |
|
Deutsche Steinkohle AG, Herne Consulting for the re-organization of the coal mining association, a 40,000 employee company, located in 50 different locations. Developed concepts for and established shared service center units. Development of a centralized, Computer Aided Facility Management system (CAFM) designed to track spending, inventory, and repair priorities. |
|
Environmental Expert Statement – Solar Farm Turnow-Preilack Feasibility study for the solar farm on the former military training area Lieberose. Checking of documentation and environmental risk assessment for the construction and operation of the solar farm. (Photo: juwi-Gruppe / First-Solar GmbH) |