PREV
NEXT
  • Environment

    Survey, Remediation, Brownfield Recycling, Expert Witness Consulting

  • Construction

    Geotechnical Engineering, Pollutant Registry, Deconstruction, Disposal

  • Energy

    Building Energy Consultation, Energy Efficiency, Energetical Renovation

  • Consulting

    Project Management, Organisational Consulting, Data Management

ref_jost

JOST-LuxCo Phase 1 Environmental Site Assessments

Phase I / Phase II Environmental Site Assessments at 13 sites located in China, France, Germany, Hungary, Italy, The Netherlands, Portugal, Spain, South Africa, and United States. Document review, interviews, visual inspections of the site and surroundings; preparation of comprehensive expert reports.

ref_epas-audits

Environmental Performance Assessment System (EPAS) Audits

On US Army installations throughout Europe, combined Environmental Management System (EMS) and Compliance Audits for drinking and wastewater, solid waste, hazardous materials and waste, refueling facilities. Compliance with German and American Standards.

 ref_UMS

Environmental Management System (EMS) Implementation on US Army installations in Bavaria and Heidelberg

Support of EMS-Implementation, internal audits, training, solutions for e.g., document control, hazardous substance inventories, environmental databases.

 ref_UMP

Environmental Management and Emergency Response Plans

On several US Army installations in Bavaria site investigations and development of management plans and emergency response plans for hazardous waste, spill prevention and response, drinking water, stormwater, observing both American and German legal and other requirements.

 ref_HM

Storage and Handling of Hazardous Materials and Waste, US Army Installations Bavaria

Inventory, inspection and database inclusion of several hundred hazardous substance storage locations, classification based on hazardous substances and water endangering substances regulations, recommendations for management and repair.

 ref_dsk

Deutsche Steinkohle AG, Herne

Consulting for the re-organization of the coal mining association, a 40,000 employee company, located in 50 different locations.  Developed concepts for and established shared service center units.  Development of a centralized, Computer Aided Facility Management system (CAFM) designed to track spending, inventory, and repair priorities.

 Foto: juwi-Gruppe / First-Solar GmbH

Environmental Expert Statement – Solar Farm Turnow-Preilack

Feasibility study for the solar farm on the former military training area Lieberose. Checking of documentation and environmental risk assessment for the construction and operation of the solar farm.

(Photo: juwi-Gruppe / First-Solar GmbH)